Minggu, 27 Oktober 2013

Analisa Tegangan Pipa Pada Kepala Sumur

Abstract:

This paper describes the result of piping stress analysis for wellhead piping. The purpose of this piping stress analysis is to anticipate any overstress on the preliminary piping is a part of the flowline system and study the requirements of expansion loop on the piping.
Pipe model starts at the wellhead as a fixed pont and ends on the first guide at the corridor. Distance from wellhead to corridor is taken 100 m. Support type applied along corridor are rest support, guide support and guide support with U-bolt. Result og analysis indicate that stress that happened at wellhead is safe.

Key word: wellhead, pipe stress, support


Syamsurrijal Ramdja
Pusat Rekayasa dan Perangkat Nuklir-Batan

0 komentar:

Posting Komentar

 
Design by Free WordPress Themes | Bloggerized by Lasantha - Premium Blogger Themes