Abstract:
The System of RSG-GAS electricity is designed for supplying the veriqus of electric loads, voltages and safety dessification of components. The electric resource were supplied by PLN, emergency gensets and betteries.
The failure of main electricity supply PLN is detected by emergency bus bars system BNA/BNB/BNC through the Main Control Room (MCR) monitoring system. This failure has an impect on the primary coolant system operation, secondary coolant system, emergency power supplies BRV 10/20/30. if the PLN electric supply falls during reactor operation, the reactor will scram and automatically shutdown to fulfilled the reactor safety criterion.
Keyword: electric failure
Teguh Sulistyo, Kiswanto, Yuyut S., M. Taufik
Sub Bidang Elektrik Bidang Sistem Reaktor
Pusat Reaktor Serba Guna Batan kawasan Puspiptek Serpong
E-mail: sulistyoteguh@plasa.com